Brick job

Joined
Nov 8, 2006
Messages
3,373
Location
Albuquerque
Name
Ron lippold
Well this one was bad. Judson juice and brush with 50 pounds...
IMAG0263.jpg

IMAG0262.jpg

IMAG0260.jpg

IMAG0261.jpg

IMAG0262.jpg

IMAG0266.jpg

IMAG0267.jpg

IMAG0268.jpg

IMAG0270.jpg

IMAG0274.jpg

IMAG0275.jpg

IMAG0276.jpg

IMAG0277.jpg
 

Attachments

  • IMAG0262.jpg
    IMAG0262.jpg
    34 KB · Views: 91
Joined
Nov 8, 2006
Messages
3,373
Location
Albuquerque
Name
Ron lippold
seven coats of concrete seal. all day job for 1800 and change. i have two est from the neighbors tomorrow. I love hard surfaces...
 
Joined
Sep 7, 2008
Messages
3,797
Ron how long did you let it dry before applying the sealer?

No one busted me on my huge mistake on the last saltillo job I did.

I didn't let it dry long enough. There is not a problem, but it is probably best to let the floor dry overnight.
 
Joined
Nov 8, 2006
Messages
3,373
Location
Albuquerque
Name
Ron lippold
Im in nm and humidity is low 1 hr dr time before first coat. The first coat of finish has to dry for 1 hr before any more can go down, and the i give each coat about 30 minutes to dry.
 

Latest posts

Back
Top Bottom