Have a big job to bid this week. 52,500 sq ft. All wide open. Tile is only 2 to 3 weeks old. Light soil.
Company provides Franklin Stripper and Wax. They want a light stripping and 3 coats of wax down.
In my arsenal I have no walk behinds, only Advance 20" ride ons available-2 of those and Reg. 15 and 17" low speeds.
It is a new store and after the 3 coats they will put down fixtures and possibly want another bid for 1-3 more coats and burnishing. Initial job is strip and 3 coats with them again providing the stripper and wax.
Treat me like an idiot. Most of my jobs are under 10k sq ft and the ride ons will be a new thing to me as are the walk behinds. Can I run stripper through the walk behind???
Job needs to be done in one weekend.
This could be funnn????
Thanks!
Company provides Franklin Stripper and Wax. They want a light stripping and 3 coats of wax down.
In my arsenal I have no walk behinds, only Advance 20" ride ons available-2 of those and Reg. 15 and 17" low speeds.
It is a new store and after the 3 coats they will put down fixtures and possibly want another bid for 1-3 more coats and burnishing. Initial job is strip and 3 coats with them again providing the stripper and wax.
Treat me like an idiot. Most of my jobs are under 10k sq ft and the ride ons will be a new thing to me as are the walk behinds. Can I run stripper through the walk behind???
Job needs to be done in one weekend.
This could be funnn????