Bjorn
Member
- Joined
- Oct 7, 2006
- Messages
- 2,450
finishing a few odds and ends and the cylinder waste tank should be done next week
off to the sign shop for a wrap for the control panel and lower front
w]http://www.youtube.com/watch?v=xHAZz4zgNxgw]
off to the sign shop for a wrap for the control panel and lower front
w]http://www.youtube.com/watch?v=xHAZz4zgNxgw]