this is the most hose out i've had on a single job.
450' hose run from the vortex and 400' run from the ThermalWave
the vortex was parked in the lot and had to run hoses around the side of the building and up to the 5th floor.
the thermalwave was parked in the underground lot and ran hoses 6 floors straight up the fire escape.
Thanks Lippold for loaning me the extra hose!
450' hose run from the vortex and 400' run from the ThermalWave
the vortex was parked in the lot and had to run hoses around the side of the building and up to the 5th floor.
the thermalwave was parked in the underground lot and ran hoses 6 floors straight up the fire escape.
Thanks Lippold for loaning me the extra hose!