I got a call today to do 12000sf of new vct. But only one day to do it. As much as I hated to, I had to pass it on to someone with more equipment and tools. Ever have to walk on a biggie because of being unable to handle the job in the time framme allotted? At a buck a square, that was a heart breaker.