Cleanworks
Moderator
- Joined
- Oct 22, 2012
- Messages
- 28,104
- Name
- Ron Marriott
Did a 4 story condo building this morning. 4 hallways, split level with 5 stairs separating the 2 levels. Made up my chemistry at the shop, loaded up the truck and spent 1.5 hours on site for $750. Hwe, if you could get close enough, would be 4 hours. Carpets look clean, smell clean and the strata president is very happy.
