GreenTechAgain
Member
Thinking about getting a Prochem Legend.
Would really like the productivity gain that I think I would get from having a water supply and heat exchanger.
Currently, with my Judson I have to hook to electric for diesel burner and water supply. It's 15 minutes every job. Doesn't matter on the large jobs, but is a real PITA on smaller jobs.
Diesel burner has no problem keeping up with tile jobs, but am concerned a HX will not.
Anyone do a lot of tile with a Legend?
Would really like the productivity gain that I think I would get from having a water supply and heat exchanger.
Currently, with my Judson I have to hook to electric for diesel burner and water supply. It's 15 minutes every job. Doesn't matter on the large jobs, but is a real PITA on smaller jobs.
Diesel burner has no problem keeping up with tile jobs, but am concerned a HX will not.
Anyone do a lot of tile with a Legend?