Mark Saiger
Mr Happy!
Just keep experimenting.
600 sq ft in about 20 minutes including moving some furniture.
the larger room was just on the other side of the doorway....didn't take pics,
But this was a bad area, so shot some pics.
Did a prevac,
Then just presprayed, not agitation (which is hard for me not to do all the steps)
Ran the zippy over it (and did a dry passes as I just can't get past not doing that either)
Dang thing just pounded out the soils!
This area was showing dry spots when I left and no fan blowing, but had good air flow in the building and fairly dry air I would guess.




Mark Saiger
www.saigers.com
"Bring on the Blue!"
600 sq ft in about 20 minutes including moving some furniture.
the larger room was just on the other side of the doorway....didn't take pics,
But this was a bad area, so shot some pics.
Did a prevac,
Then just presprayed, not agitation (which is hard for me not to do all the steps)
Ran the zippy over it (and did a dry passes as I just can't get past not doing that either)
Dang thing just pounded out the soils!
This area was showing dry spots when I left and no fan blowing, but had good air flow in the building and fairly dry air I would guess.
Mark Saiger
www.saigers.com
"Bring on the Blue!"