Mikey P
Administrator
Prevac, CRB or 175, Multi Sprayer, fans, lamps??
Sure most jobs can be done with out any of the above, but we're premium....
KSBW Monterey: Santa Cruz residents in limbo as PG&E delays power shutoffs.
www.ksbw.com
Sure most jobs can be done with out any of the above, but we're premium....
KSBW Monterey: Santa Cruz residents in limbo as PG&E delays power shutoffs.

Santa Cruz residents in limbo as PG&E delays power shutoffs
The shutoff that was originally expected to start at noon Wednesday was pushed back to 8 p.m. and then to later into the evening as weather patterns changed.
